555 results found.
Year: 2014, Volume: 14, Number: 1
... group profile and, based on experiences, it also brings new challenges given the overload of available content descriptions, suggest new content that best information that the viewer ... functionalities are usually pretty limited. Content-based systems – The system tries to find new Overloaded with a lot of programs, many viewers items that are similar to the ...
Terms matched: 2 - Score: 5 - 785k
Year: 2014, Volume: 14, Number: 1
... ) in a 30 bus IEEE test system is determined. At first, the load flow equations of the 30 bus IEEE test system (UPFC), Static ... 3, 4], maximum transmission lines causes adverse impact on the network, loading, and density of system lines [5, 6]. including power ...
Terms matched: 2 - Score: 17 - 817k
Year: 2014, Volume: 14, Number: 1
... /rev. and an electromagnetic brake (see Fig. 18). Therefore, a single- 0.20 phase Synchronous Generator (SG) was manufactured to 0.15 load the servomotor. 0.10 0.05 0.00 M-19 Steel 0 20 40 60 80 100 120 Position [degrees] coil coil coil [B: -16] Air ...
Terms matched: 1 - Score: 3 - 1,476k
Year: 2014, Volume: 14, Number: 1
... on Recent Advances in Intrusion Detection, Boston, MA, Category:OWASP_WebGoat_Project 2008. [33] HackMe bank, http://www.mcafee.com/us/downloads/free- [21] S. Mcallister, E. Kirda, and C. Kruegel, "Leveraging user interactions tools/hacme-bank.aspx for in-depth testing ...
Terms matched: 1 - Score: 3 - 600k
Year: 2014, Volume: 14, Number: 1
... calculation, according to power squirrel cage motors are continuously reevaluated and the design method. enriched with new elements. The final goal is to optimize the performances for load C. Determining the minimum of the objective function operation [2 ], [17-18], by increasing the estimation accuracy To optimize the multivariable problems, ...
Terms matched: 1 - Score: 13 - 1,120k
Year: 2014, Volume: 14, Number: 1
... three Figure 2. The conceptual measuring scheme for measuring load power laptops and one access point. consumption. ... Direct indicating the effect of energy optimization. Current) loads, we decided to measure AC consumption. A ... streaming, etc. [5]. Combined do download data (e.g., software updates/upgrades ...
Terms matched: 6 - Score: 232 - 652k
Year: 2014, Volume: 14, Number: 1
... measurement time are also recorded. This generates data operating point (voltage and current) can be calculated from for all measurements which are transmitted over the network the load characteristic of the PV module. The measuring and stored in the database for later post processing and equipment, methods and algorithms are provided by analyzing. Currently ...
Terms matched: 1 - Score: 10 - 884k
Year: 2014, Volume: 14, Number: 1
... consists of two sub-phases: passive, P_comp, and Three phases characterize accelerator operation: a) Initial active computation, A_comp (see Fig. 7). loading of input data A, B and C, into MA, MB and MC; b) VI. PERFORMANCE EVALUATION Execution phase, and c) Result ...
Terms matched: 1 - Score: 5 - 735k
Year: 2014, Volume: 14, Number: 1
... , the resultant field above the ground. The magnetic field strength follows the curve load of the three-phase) or equipment, the magnetic field decreases consumer. Consequently ... by the measurements performed in situ and presented in was energized even if it's not loaded. As such, the electric this paper). field has a variation ...
Terms matched: 2 - Score: 12 - 585k
Year: 2014, Volume: 14, Number: 1
... ANFIS decides that these blocks addition, the register update unit size of 128; load store should not be replaced. queue size of 64; as well as ... for the CPU to obtain the required that can perform efficiently for all types of workloads is yet instructions. available. Replacement policies used in level 1 cache memory ...
Terms matched: 2 - Score: 16 - 707k