Click to open the HelpDesk interface
AECE - Front page banner

Menu:


FACTS & FIGURES

JCR Impact Factor: 0.700
JCR 5-Year IF: 0.700
SCOPUS CiteScore: 1.8
Issues per year: 4
Current issue: May 2024
Next issue: Aug 2024
Avg review time: 57 days
Avg accept to publ: 60 days
APC: 300 EUR


PUBLISHER

Stefan cel Mare
University of Suceava
Faculty of Electrical Engineering and
Computer Science
13, Universitatii Street
Suceava - 720229
ROMANIA

Print ISSN: 1582-7445
Online ISSN: 1844-7600
WorldCat: 643243560
doi: 10.4316/AECE


TRAFFIC STATS

2,654,776 unique visits
1,051,993 downloads
Since November 1, 2009



Robots online now
bingbot
Googlebot
Sogou
Amazonbot


SCOPUS CiteScore

SCOPUS CiteScore


SJR SCImago RANK

SCImago Journal & Country Rank




TEXT LINKS

Anycast DNS Hosting
FEATURED ARTICLES

Application of the Voltage Control Technique and MPPT of Stand-alone PV System with Storage, HIVZIEFENDIC, J., VUIC, L., LALE, S., SARIC, M.
Issue 1/2022

AbstractPlus






LATEST NEWS

2024-Jun-20
Clarivate Analytics published the InCites Journal Citations Report for 2023. The InCites JCR Impact Factor of Advances in Electrical and Computer Engineering is 0.700 (0.700 without Journal self-cites), and the InCites JCR 5-Year Impact Factor is 0.600.

2023-Jun-28
Clarivate Analytics published the InCites Journal Citations Report for 2022. The InCites JCR Impact Factor of Advances in Electrical and Computer Engineering is 0.800 (0.700 without Journal self-cites), and the InCites JCR 5-Year Impact Factor is 1.000.

2023-Jun-05
SCOPUS published the CiteScore for 2022, computed by using an improved methodology, counting the citations received in 2019-2022 and dividing the sum by the number of papers published in the same time frame. The CiteScore of Advances in Electrical and Computer Engineering for 2022 is 2.0. For "General Computer Science" we rank #134/233 and for "Electrical and Electronic Engineering" we rank #478/738.

2022-Jun-28
Clarivate Analytics published the InCites Journal Citations Report for 2021. The InCites JCR Impact Factor of Advances in Electrical and Computer Engineering is 0.825 (0.722 without Journal self-cites), and the InCites JCR 5-Year Impact Factor is 0.752.

2022-Jun-16
SCOPUS published the CiteScore for 2021, computed by using an improved methodology, counting the citations received in 2018-2021 and dividing the sum by the number of papers published in the same time frame. The CiteScore of Advances in Electrical and Computer Engineering for 2021 is 2.5, the same as for 2020 but better than all our previous results.

Read More »


SEARCH THE JOURNAL CONTENT


Enter one or more keywords to search for.
For exact phrase matching use quotation marks (e.g. "speed controller").
Note that '*' and '?' wildcards are supported.

Search for:

Results per page:

Match: any search words all search words

Search results for: estimate

404 results found.

41 pages of results.
Sorted by relevance / Sort by date
Year: 2014, Volume: 14, Number: 3
... PV point, where PV generator operates with maximum power, systems. M. A. G. Brito et al. [8] performs the comparison is estimated either measuring current, voltage and radiation of usual MPPT methods using solar array simulator. They values or with numerical approximations-mathematical made a comparison between twelve methods with ...
Terms matched: 1  -  Score: 3  -  968k
Year: 2010, Volume: 10, Issue: 2
... at a time, when the The algorithm follows the steps: level of the noise is increased and when multiple reflections  the positions of the nodes are roughly estimated occur. These cases require more analysis, in order to be (they will be used as first approximation in the solved. iterative procedure) The embedded ...
Terms matched: 1  -  Score: 3  -  1,551k
Year: 2010, Volume: 10, Issue: 4
... ï‚´ fitness (2) j (7) length. However, in practice, a path is feasible if it meet several conditions, such as safety, estimated needed time for By minimizing the overall fitness function regarding the navigation, energy consumption, etc. assigned weights of each criterion, a suitable path is A ...
Terms matched: 1  -  Score: 3  -  12,034k
Year: 2020, Volume: 20, Number: 3
... system to enhance the contrast of the low- The resulting visual data, combined with the RealSense resolution images overcoming the shortcomings of the software, create a depth estimate, i.e. provide a depth image. traditional methods. They have highlighted the significant RealSense cameras use stereovision to calculate depth. improvements of the image contrast ...
Terms matched: 1  -  Score: 3  -  1,814k
Year: 2010, Volume: 10, Issue: 2
... present the middle of this rectangle to ensure perfect Line-Of-Sight. – and in a "used office" – people are working and crossing For each reference node the estimated/measured distances to the room. These tests were performed during the day and the blindfolded node are stored. The retrieved test results are overnight in a ...
Terms matched: 1  -  Score: 3  -  801k
Year: 2010, Volume: 10, Issue: 3
... The basic strategy for steering is shown in developed in the automotive industry that addresses lane fig. 1 [8]. According to the fig.1, the driver estimates where departure accidents: lane departure warning systems, lane the vehicle moves and recognizes the motions of the vehicle keeping systems and yaw stability control systems [5 ...
Terms matched: 1  -  Score: 3  -  917k
Year: 2010, Volume: 10, Issue: 1
... linguistic variables and output/input characteristics are but the frequency of the rotor field is neither computed nor analyzed. A simple but robust structure enables a wide range estimated but it is imposed depending on the load torque speed control of the driving system. The rotor flux field value i.e. the slip frequency, and then ...
Terms matched: 1  -  Score: 3  -  413k
Year: 2015, Volume: 15, Number: 3
... policies of Figure 9. Example of geocomputation flow "Backfill", "Job priority", "Fairness and fairshare" and "Policy exemption". The estimated completion time of each When dealing with more complex real world problem, we action in workflow is the most important factor for efficient can elaborate the model to ...
Terms matched: 1  -  Score: 3  -  1,662k
Year: 2021, Volume: 21, Number: 2
... until convergence. V. SIMULATION RESULTS We present the simulation results of our proposed MOOP optimization in this section. The convergence performance of our proposed algorithms is also estimated through simulation results. We consider that the RRHs with two antennas (U= 2) are fixed in a square grid. The number of Figure 2 ...
Terms matched: 1  -  Score: 3  -  1,348k
Year: 2023, Volume: 23, Number: 2
... of the L Y Y Y Y Y -2Vdc switch used in the circuit is explained in [33]. The energy 13 loss in the switch can be estimated considering the parasitic Since the levels of the carrier waves are shifted for each capacitor Coss of the transistor considered. The value of Coss output level. So ...
Terms matched: 1  -  Score: 3  -  2,088k
Result Pages: << Previous 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Next >>


Search took 0.292 seconds


The search engine database includes all papers published after 2007, including titles, author names, abstracts, keywords, full papers text, references and citations. For papers published between 2001 and 2006, please visit the Archive section.


We invite you to try the most frequently used search terms:

system - power - control - fault - network - load - model - frequency - converter - transformer - harmonic - computer - algorithm - cancer - simulation - computer - estimate - optimal control - expert system - electromagnetic - interference - data transmission - neural network - electrocardiogram signal - model - cluster - design - wavelet - antenna - wireless sensor - coupling - robust - noise - signal processing - system identification - translation - nonlinear systems - induction motor - speed controller - shape optimization - fuzzy network - wireless sensor network


Website loading speed and performance optimization powered by: 


DNS Made Easy