Click to open the HelpDesk interface
AECE - Front page banner

Menu:


FACTS & FIGURES

JCR Impact Factor: 0.700
JCR 5-Year IF: 0.700
SCOPUS CiteScore: 1.8
Issues per year: 4
Current issue: May 2024
Next issue: Aug 2024
Avg review time: 58 days
Avg accept to publ: 60 days
APC: 300 EUR


PUBLISHER

Stefan cel Mare
University of Suceava
Faculty of Electrical Engineering and
Computer Science
13, Universitatii Street
Suceava - 720229
ROMANIA

Print ISSN: 1582-7445
Online ISSN: 1844-7600
WorldCat: 643243560
doi: 10.4316/AECE


TRAFFIC STATS

2,660,832 unique visits
1,053,499 downloads
Since November 1, 2009



Robots online now
bingbot
Googlebot


SCOPUS CiteScore

SCOPUS CiteScore


SJR SCImago RANK

SCImago Journal & Country Rank




TEXT LINKS

Anycast DNS Hosting
FEATURED ARTICLES

Analysis of the Hybrid PSO-InC MPPT for Different Partial Shading Conditions, LEOPOLDINO, A. L. M., FREITAS, C. M., MONTEIRO, L. F. C.
Issue 2/2022

AbstractPlus






LATEST NEWS

2024-Jun-20
Clarivate Analytics published the InCites Journal Citations Report for 2023. The InCites JCR Impact Factor of Advances in Electrical and Computer Engineering is 0.700 (0.700 without Journal self-cites), and the InCites JCR 5-Year Impact Factor is 0.600.

2023-Jun-28
Clarivate Analytics published the InCites Journal Citations Report for 2022. The InCites JCR Impact Factor of Advances in Electrical and Computer Engineering is 0.800 (0.700 without Journal self-cites), and the InCites JCR 5-Year Impact Factor is 1.000.

2023-Jun-05
SCOPUS published the CiteScore for 2022, computed by using an improved methodology, counting the citations received in 2019-2022 and dividing the sum by the number of papers published in the same time frame. The CiteScore of Advances in Electrical and Computer Engineering for 2022 is 2.0. For "General Computer Science" we rank #134/233 and for "Electrical and Electronic Engineering" we rank #478/738.

2022-Jun-28
Clarivate Analytics published the InCites Journal Citations Report for 2021. The InCites JCR Impact Factor of Advances in Electrical and Computer Engineering is 0.825 (0.722 without Journal self-cites), and the InCites JCR 5-Year Impact Factor is 0.752.

2022-Jun-16
SCOPUS published the CiteScore for 2021, computed by using an improved methodology, counting the citations received in 2018-2021 and dividing the sum by the number of papers published in the same time frame. The CiteScore of Advances in Electrical and Computer Engineering for 2021 is 2.5, the same as for 2020 but better than all our previous results.

Read More »


SEARCH THE JOURNAL CONTENT


Enter one or more keywords to search for.
For exact phrase matching use quotation marks (e.g. "speed controller").
Note that '*' and '?' wildcards are supported.

Search for:

Results per page:

Match: any search words all search words

Search results for: load

591 results found.

60 pages of results.
Sort by relevance / Sorted by date ▼
Year: 2015, Volume: 15, Number: 4
... the interface by emulating high As mentioned above, the scanning process generates two traffic loads. This was implemented by sending a continuous files, both containing a 3D ... model reconstruction is afterwards architectures, Virtual prototyping, Virtual reality, Web available for download. services. We propose two major improvements over the traditional scanning solutions, ...
Terms matched: 2  -  Score: 5  -  1,262k
Year: 2015, Volume: 15, Number: 4
... of both gate and source degeneration respectively. Diode connected load Provided the two amplifiers building the VGA are transistors ... in [13], and deploys a four- loaded with diode-connected transistors M 3 -M 4. The ... factor (Q) is and M 9 -M 10 loading the differential stage M 5 -M 6. expressed ...
Terms matched: 3  -  Score: 14  -  1,431k
Year: 2015, Volume: 15, Number: 4
... coils because the temperature sensors required are 100kHz switching frequency. This is why the resistance reference is computed on a PC in order to minimize the 1 unnecessary processing load. This work was supported by a grant of the Romanian National Authority for Scientific Research, CNDI – UEFISCDI, project number PN- II-PT-PCCA-2011-3.2-0219 (Contract no ...
Terms matched: 1  -  Score: 17  -  1,502k
Year: 2015, Volume: 15, Number: 4
... The DC output voltage reference( v*dc) is 700V and a resistive load is connected between the two DC output terminals p and n. Fig. ... ," IEEE Trans. Sustainable Energy, Vol.4, No.1, generator supplying unbalanced loads," Advances in Electrical and pp.154 – 161, Jan.2013. [Online ...
Terms matched: 2  -  Score: 10  -  1,193k
Year: 2015, Volume: 15, Number: 4
... the control system stopped accelerating and formance of YILDIZ with these simulation models. the load current decreased from 58 A to 38 A as shown on Considering the SOC ... 1210 s as seen on SEV model. Accordingly, a range model could be uploaded Fig. 12(a) and Fig. 12(b). ...
Terms matched: 2  -  Score: 4  -  1,358k
Year: 2015, Volume: 15, Number: 4
... set of measurement-based approach in the identification of coherent critical load buses or area belongs to a coherent group, ... the Excitation Limiters (OXL), presence of dynamic loads, etc. development of a hybrid Calinski-Harabasz criterion ... k- An algorithm for clustering the generators in the system means algorithm to determine the optimal number of into ...
Terms matched: 5  -  Score: 268  -  1,493k
Year: 2015, Volume: 15, Number: 4
... the simulation run, each node having 16 randomly- upload bandwidth utilization, respectively. As presented in chosen ... in the end. Let T c be the average download delay where they are rare in the neighborhood, ... PERFORMANCE SIMULATION STUDY download speed (i.e., total downloads minus duplicate and In order to prove the efficacy ...
Terms matched: 5  -  Score: 109  -  1,280k
Year: 2015, Volume: 15, Number: 3
... between Figure 1. Model of the observed system. lines to neutral [21]. Values of amplitudes of voltage and Equipment under test (EUT) is load connected via cable current surges delivered by CWG in open circuit and short S-EUT at one socket of single power line. Due to continuous circuit are 6kV and ...
Terms matched: 1  -  Score: 156  -  1,482k
Year: 2015, Volume: 15, Number: 3
... package with the 2014. [Online]. Available: http://dx.doi.org/10.1007/s10844-014- implementation of the approach. It is available to download 0319-2 [17] U. Markowska-Kaczmar and A. Hurej, "Evaluation of subspace at http://marosz.kia.prz.edu.pl/subspace.html. clustering quality," ...
Terms matched: 1  -  Score: 3  -  1,251k
Year: 2015, Volume: 15, Number: 3
... middleware to attributes. The CTOAS will fabricate its own EC and then develop new technology for group communication and use it to make EULS. Finally, we apply overload technique resource sharing across heterogeneous embedded systems. of object-oriented theory to specify how EC works among This project presented service oriented architecture [14-15] CEO, CEOAS ...
Terms matched: 1  -  Score: 6  -  1,291k
Result Pages: << Previous 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 Next >>


Search took 0.280 seconds


The search engine database includes all papers published after 2007, including titles, author names, abstracts, keywords, full papers text, references and citations. For papers published between 2001 and 2006, please visit the Archive section.


We invite you to try the most frequently used search terms:

system - power - control - fault - network - load - model - frequency - converter - transformer - harmonic - computer - algorithm - cancer - simulation - computer - estimate - optimal control - expert system - electromagnetic - interference - data transmission - neural network - electrocardiogram signal - model - cluster - design - wavelet - antenna - wireless sensor - coupling - robust - noise - signal processing - system identification - translation - nonlinear systems - induction motor - speed controller - shape optimization - fuzzy network - wireless sensor network


Website loading speed and performance optimization powered by: 


DNS Made Easy