404 results found.
Year: 2021, Volume: 21, Number: 2
... difficult the full decomposition. A diagonal operating cost, [2-3], [14]. quadratic approximation method produces an approximated A generic software for ED problems estimates the optimal block separation of the penalty term, so that the ED model is value of power to be generated with the least possible fuel decomposed into several ...
Terms matched: 1 - Score: 3 - 1,584k
Year: 2021, Volume: 21, Number: 4
... resource allocation [20-21] and observe the cloud provider's revenues; (iii) depending on threshold-based dynamic resource consolidation can be used the chosen security scenario, we estimate energy [22-25]. Some solutions are proposed to tackle both revenue consumption, where the upper CPU utilization threshold is maximization and energy consumption [26-27] ...
Terms matched: 1 - Score: 3 - 1,956k
Year: 2021, Volume: 21, Number: 3
... for some values of μ. Hence, considering the design of ƒ ƒƒ our LCSQ for the particular variance, we can conclude that In this case, we estimate SQNR as: one should better use the exact formulas, defined with (19) ƒ 2 ƒ SQNR() € 10 log10 ƒ ƒ. ...
Terms matched: 1 - Score: 3 - 1,269k
Year: 2010, Volume: 10, Issue: 1
... energy. The turbo encoder has a post-interleaver trellis At high and moderate SNRs, the error floor can be termination (flushing), which means that both convolutional estimated through the bounds from equations (3) and (4). encoders are reset in an independent manner. This is done Eb by commuting the two ...
Terms matched: 1 - Score: 3 - 496k
Year: 2010, Volume: 10, Issue: 1
... 1 point. 100 In related graph (Figure 9) we give 100 point to each 80 Q € Learning place that it has 3 degree and in other estimates laces of b, c, 60 Cooperative Q € Learning d and we define the place of the wounded degrees to related 40 reward. Then we find ...
Terms matched: 1 - Score: 3 - 611k
Year: 2010, Volume: 10, Issue: 1
... III. PMTFG DESIGN PROCEDURE Basically, an electric machine designing procedure must follow four compulsory steps: 1) Sizing-designing step, when the main dimensions and characteristics are estimated; 2) A 2D or 3D €“ FEM analysis to check the electromagnetic performances of the previously calculated machine; 3) Loss and heating calculation via 2D ...
Terms matched: 1 - Score: 3 - 423k
Year: 2021, Volume: 21, Number: 3
... temperature-dependent reaction rate, electrolytes, and current collectors. Then, the various αa, αc is the symmetry factor, Ce, Cs are lithium governing equations were estimated for the 2D structure of concentration in the solid and electrolyte phase and Csurf, max, the model for a better understanding of the ionic/ electronic Csurf ...
Terms matched: 1 - Score: 3 - 1,304k
Year: 2009, Volume: 9, Issue: 3
... (5) The backoff time have a random value and can be only For 802.11b we have 192μs+ 14 x 8b/ 1 Mbps= 203 μs. estimated as an average value. The station selects a starting Other values for TACK are also calculated in Table 3. backoff time as a value inside the interval ...
Terms matched: 1 - Score: 3 - 390k
Year: 2010, Volume: 10, Issue: 4
... FRACTAL ANALYSES OF The dependences log J (δ) log d 1 are approximated PHASE MAPS using the least-squares method into the curves V (η), To estimate δ (m n) distributions, we calculated the set straight parts of which are used to determine the slope of statistical moments of the 1-st to 4-th ...
Terms matched: 1 - Score: 3 - 986k
Year: 2021, Volume: 21, Number: 4
... , EExcess(t) and EUndel(t). The load used in the particle's history, and lit is the best position in the swarm's calculations is estimated for each hour of the day. Since the history. algorithm is used for daily planning, the results are C. Stochastic-Dynamic Algorithm evaluated by the daily ...
Terms matched: 1 - Score: 3 - 2,841k