591 results found.
Year: 2013, Volume: 13, Number: 4
... from the power components and simulate the non-sinusoidal condition with systems field, e.g. modeling, simulation, measurements, the help of a VI. The detection of loads characteristics and process control, protections etc. Furthermore, dedicated the simulation of power flow using the Park transform software tools have been developed to sustain and improve ...
Terms matched: 1 - Score: 3 - 902k
Year: 2013, Volume: 13, Number: 4
... , we propose AODV- download, store, and upload the data messages from/to the DTN algorithm ... , Online Codes [28], and different network load [10]. Some of these methods try ... the DTN routing policy requires, we propose AODV- download, store, and upload the data messages from ...
Terms matched: 5 - Score: 97 - 878k
Year: 2013, Volume: 13, Number: 4
... through a variable resistor method. Another possible method is to use a DC electronic load (eload) such as in [20-21]. The proposed semi-automated system ... testing and monitoring the performance of PV module in outdoor conditions, Figure 2. Interface for PV-TM system hereafter indicated as PV-TM (Testing and Monitoring), is ...
Terms matched: 2 - Score: 18 - 995k
Year: 2013, Volume: 13, Number: 4
... found to be more for selecting the inputs driving the FUs during a particular amenable to interconnect optimization and the subsequent time step and also selecting the FU output for loading a rebinding step for power reduction than the constructive register. Thus a proper estimate of the area of a binding approach. It is proposed that this approach ...
Terms matched: 1 - Score: 3 - 599k
Year: 2013, Volume: 13, Number: 4
... according to (12), Fig. 2 considered N-level piecewise linear compandor, composed presents the nonlinear optimal compressor function and the from the granular Dg and the overload distortion Dov, can be obtained piecewise linear compressor function that defines computed by [2 ]: the proposed piecewise linear compandor (PLC). Obviously, ...
Terms matched: 1 - Score: 3 - 669k
Year: 2013, Volume: 13, Number: 4
... stage, the using vTclk cycles. At the same time, the content of the R2 addition within S1 stage, two stages corresponding to the S2 register is loaded in parallel with the updated check nodes additions, ROM memory data read within S3 stage, the values (R3), and the R1 content is also ...
Terms matched: 1 - Score: 3 - 609k
Year: 2013, Volume: 13, Number: 4
... " [5 ], this FOP consists of four identical modules in its structure- a, b, c, d. All external bus are intended to load from the memory a component of the quaternion and send the results to memory operations. Each module (Figure 3) contains a matrix multiplier MPM1 and MX2 ...
Terms matched: 1 - Score: 3 - 777k
Year: 2013, Volume: 13, Number: 4
... degrees of freedom that will not be the subject of the kinematic couplings, initial conditions or the system modal overlap. These are called degrees of freedom to the loads; limit. Modal overlap is recovered in two key areas:- Building the kinematic model of the mechanical system, kinematic markers associated with flexible elements, ...
Terms matched: 1 - Score: 3 - 1,048k
Year: 2013, Volume: 13, Number: 4
... )/N cycles are required to process (to upload) all Fig. 2a is faster. However ... ) part of the Register R can be reused to load a permit very limited number of data items to ... sorting 4c). Since a new portion can be loaded at each clock cycle, in such a way ...
Terms matched: 3 - Score: 17 - 698k
Year: 2013, Volume: 13, Number: 4
... there are packets in at each sensor node. We load packets through a constant bit its buffer, and ... duty cycle MAC protocol for dynamic traffic IV. CONCLUSION loads in wireless sensor networks," in Proc. ... Conference For WSN applications, the data gathering effect and the on Embedded Network Sensor Systems, 2008, pp ...
Terms matched: 4 - Score: 26 - 789k